Ross Street Underpass

Ross Street Underpass Client: City of Salmon Arm Location: Salmon Arm, BC Value: $15,188,230 Completion: Spring 2023 Project Synopsis: To provide safe, uninterrupted, grade-separated crossing of the CP Rail, accessible underpass to pedestrian, cyclist, and vehicular traffic which will allow for the closure of the existing Marine Park Drive at-grade crossing. Relocate existing trunk sewer...

Open post

YVR Access Structure

YVR Station Access Structure Client: SNC Lavalin Inc. Location: Richmond, BC Value: $4,651,435 Completion Date: May 2008 Project Synopsis: Welcoming international visitors landing at the Vancouver International Airport (YVR), YVR Station included complex scheduling for a phased construction process which was required to complete this fast-paced heavy construction project. The station was more like building...

Open post

Cheakamus Sea to Sky Suspension Bridge

Cheakamus Sea to Sky Suspension Bridge Client: Resort Municipality of Whistler Location: Whistler, BC Value: $283,620 Completed: November 2014 Project Synopsis: Clearing and site preparation for two pedestrian bridges Supply and installation of rock anchors and micropiles Construction of cast-in-place concrete tower footings Supply and installation of steel bridge towers; main bridge cables; hangers and...

Bear Flat Bridge

Bear Flat Bridge Client: BC Ministry of Transportation and Infrastructure Location: Fort St John, BC Value: $79,200,000 Anticipated Completion: 2023 Project Synopsis: Construction of a 2-lane, 600 meter long, steel girder bridge with cast-in-place concrete abutments, piers, and deck. Construction of 8 km of 2-lane highway. Construction and removal of temporary detour road and bridge....

Open post

Mosquito Creek Bridge

Mosquito Creek Bridge Client: City of North Vancouver Location: North Vancouver, BC Value: $12,000,000 Completion: October 2021 Project Synopsis: Staged construction of 2-span, 6-lane bridge with precast substructure and deck. Construction of multi-use pedestrian pathway Construction of MSE retaining wall Reconstruction of stream bed

Westshore Terminals Bridge

Westshore Terminals Bridge Client: Westshore Terminals Location: Delta, BC Value: $2,900,000 Completed: Fall 2017 Project Synopsis: Construction of a single lane, steel girder bridge with cast-in-place concrete abutments and piers, and a precast deck. Construction of MSE wall ramps. Demolition and removal of existing bridge.

Open post

NASS River Bridge

NASS River Bridge Client: BC Ministry of Transportation and Infrastructure Location: Meziadin Junction, BC Value: $19,150,000 Completed: October 2019 Project Synopsis: Construction of a 2-lane, 145 meter long, 3 span, steel girder bridge with cast-in-place concrete abutments, piers and deck. Construction of 1.9 Kilometers of 2 lane highway and rest area complete with washrooms and...

Stewardson Way Pedestrian Overpass

Stewardson Way Pedestrian Overpass Client: BC Ministry of Transportation and Infrastructure Location: New Westminster, BC Value: $4,000,000 Completed: August 2019 Project Synopsis: Construction of a 120 meter long, 4 span, steel girder bridge with cast-in-place concrete abutments, piers and deck. Construction of access ramps and retaining walls. Construction of galvanized safety railing. Temporary retainment of...