Open post

Nelson Creek Bridge Rehab and Seismic Retrofit

Nelson Creek Bridge Rehab and Seismic Retrofit Client: BC Ministry of Transportation and Infrastructure Location: North Vancouver, BC Value: $6,268,815 Completed: May 2015 Project Synopsis: Concrete layovers over all pier grade beams Construction of shear walls Replacement of all bearings Superstructure work consisting of shear keys and diaphragms between girders Expansion joint replacement Repair and...

Open post

Knight Street Bridge

Knight Street Bridge Client: Translink Location: Vancouver, BC Value: $8,836,320 Completed: April 2009 Project Synopsis: Upgrades to the bridge substructures including: Concrete Overlays Shear walls FRP wraps Extensive coring for dowel, dywidag and bolt installations 157 girders were jacked to replace existing bearings. Reinforced concrete shear keys and horizontal restraint bearings were fabricated and installed.

Open post

Mission Bridge Seismic Safety Retrofit

Mission Bridge Seismic Safety Retrofit Client: Ministry of Transportation and Infrastructure Location: Mission, BC Value: $10,457,945 Completion date: April 2012 Project Synopsis: Upgrade to pier footings to improve structural integrity Extending steel beams, replacing bearings and installing splice plates Deck expansion joints removal and replacement Installation of dywidag bars, dowels, post tensioning and fiber wrapping

Open post

Gaglardi Way Bridge

Gaglardi Way Bridge Client: City of Burnaby Location: Burnaby, BC Value: $1,271,388,63 Completion date: February, 2014 Project Synopsis: Remove and replace unsuitable backfill Culvert removal and bio swale Ship out, form, and pour deck drains Railing modifications Additional east parapet reinforcing Deck concrete scarification, local deck sub-excavating, concrete demolition, push through abutment works, bicycle railing,...

Open post

Almondel Road Overpass

Almondel Road Overpass Client: Ministry of Transportation and Infrastructure Location: West Vancouver, BC Value: $2,553,100 Completion date: May, 2016 Project Synopsis: Shear key construction Abutment retrofit Fiber-reinforced concrete deck overlay Bearing replacement Concrete repair Traffic management

Pattullo Deck Rehabilitation

Pattullo Deck Rehabilitation Client: Translink Location: New Westminster, BC Value: $7,967,905 Completed: January 2017 Project Synopsis: Mobilization and access construction, including minor vegetation clearing at lay-down area(s) and access routes/points Removal and disposal of asphalt wearing surface by milling and underlying layer of concrete deck by scarification (jackhammering) and/or hydro-demolition Concrete deck repairs (shallow to...

Cottonwood Creek Bridge

Cottonwood Creek Bridge Client: BC Ministry of Transportation and Infrastructure Location: Nelson, BC Value: $935,535 Completed: November 2016 Project Synopsis: The cottonwood creek bridge is a five lane bridge over Highway 3A/6 interchange in Nelson. The rehabilitation project includes resurfacing the bridge deck, replacing bearings and deck joints, repairing the contact pier caps, pier columns...

Sande Street Bridge

Sande Street Bridge Client: Ministry Of Transportation Location: Sande Street Bridge, Terrace, BC Value: $1,791,898.00 Completed: June 2017 Project Synopsis: Remove existing concrete deck and expansion joints Remove existing concrete and replace with new reinforced steel and grout Full and partial depth repair of girders Supply and install reinforced concrete overlay

Scroll to top