Ruskin Dam

Ruskin Dam Client: BC Hydro Location: Ruskin, BC Value: $3,263,465 Completion: December 2017 Project Synopsis: Remove one fire door in the lower air gallery; Build one new fire door in the lower air gallery; Cut one opening in slab on mezzanine above upper air gallery; Cut one opening in the slab on the upper air...

Coquitlam Dam

Coquitlam Dam Client: JJM Construction Ltd. Location: Coquitlam, BC Value: $1,765,640 Completion: June 2007 Project Synopsis: The construction of a huge concrete gravity wall at one end of the dam structure which tied into a native rock outcropping. Tunnels were constructed inside the concrete structure to allow examination in the years to come. The structure...

Open post

Trio Creek Hydroelectric

Trio Creek Hydroelectric Client: CCL Infrastructure Location: Harrison Lake, BC Value: $50,000,000 Completion: March 2022 Project Synopsis: Construction of a 27 MW Run of River hydro station consisting of: Intake structure; 5.2 km of 1500 mm to 1700 mm penstock; 2 powerhouses c/w tailrace; and Access upgrades to facilitate construction.

Scroll to top