Bear Flat Bridge

Bear Flat Bridge

Client: BC Ministry of Transportation and Infrastructure

Location: Fort St John, BC

Value: $79,200,000

Anticipated Completion: 2023

Project Synopsis:

  • Construction of a 2-lane, 600 meter long, steel girder bridge with cast-in-place concrete abutments, piers, and deck.
  • Construction of 8 km of 2-lane highway.
  • Construction and removal of temporary detour road and bridge.
  • Construction and removal of temporary access road and bridge.
Scroll to top