Athabasca River Bridge

Athabasca River Bridge - PPC Deck Overlay

Client: Suncor Energy Inc.

Location: Fort McMurray, AB

Value: $1,191,990

Completion: July 2019

Project Synopsis:

Supply and Install of Polyester Polymer Concrete (PPC) deck overlay system and finishing work for the Athabasca River Bridge – PPC Deck Overlay Project.

The deck was paved using Kwik Bond’s Polyester Polymer Concrete.  The bridge is 10.2m and 396m long.  Access to the bridge was on night shift only and had to be opened to operations by no later than 5am each shift.

Scroll to top