Bear Flat Bridge Client: BC Ministry of Transportation and Infrastructure Location: Fort St John, BC Value: $79,200,000 Anticipated Completion: 2023 Project Synopsis: Construction of a 2-lane, 600 meter long, steel girder bridge with cast-in-place concrete abutments, piers, and deck. Construction of 8 km of 2-lane highway. Construction and removal of temporary detour road and bridge....
Month: January 2021
Mosquito Creek Bridge
Mosquito Creek Bridge Client: City of North Vancouver Location: North Vancouver, BC Value: $12,000,000 Completion: October 2021 Project Synopsis: Staged construction of 2-span, 6-lane bridge with precast substructure and deck. Construction of multi-use pedestrian pathway Construction of MSE retaining wall Reconstruction of stream bed
Historical Projects (Hydro)
Coquitlam Dam
Coquitlam Dam Client: JJM Construction Ltd. Location: Coquitlam, BC Value: $1,765,640 Completion: June 2007 Project Synopsis: The construction of a huge concrete gravity wall at one end of the dam structure which tied into a native rock outcropping. Tunnels were constructed inside the concrete structure to allow examination in the years to come. The structure...
Trio Creek Hydroelectric
Trio Creek Hydroelectric Client: CCL Infrastructure Location: Harrison Lake, BC Value: $50,000,000 Completion: March 2022 Project Synopsis: Construction of a 27 MW Run of River hydro station consisting of: Intake structure; 5.2 km of 1500 mm to 1700 mm penstock; 2 powerhouses c/w tailrace; and Access upgrades to facilitate construction.
Historical Projects (Bridge Rehab / Demo)
Pattullo Deck Rehabilitation
Pattullo Deck Rehabilitation Client: Translink Location: New Westminster, BC Value: $7,967,905 Completed: January 2017 Project Synopsis: Mobilization and access construction, including minor vegetation clearing at lay-down area(s) and access routes/points Removal and disposal of asphalt wearing surface by milling and underlying layer of concrete deck by scarification (jackhammering) and/or hydro-demolition Concrete deck repairs (shallow to...
Cottonwood Creek Bridge
Cottonwood Creek Bridge Client: BC Ministry of Transportation and Infrastructure Location: Nelson, BC Value: $935,535 Completed: November 2016 Project Synopsis: The cottonwood creek bridge is a five lane bridge over Highway 3A/6 interchange in Nelson. The rehabilitation project includes resurfacing the bridge deck, replacing bearings and deck joints, repairing the contact pier caps, pier columns...
Sande Street Bridge
Sande Street Bridge Client: Ministry Of Transportation Location: Sande Street Bridge, Terrace, BC Value: $1,791,898.00 Completed: June 2017 Project Synopsis: Remove existing concrete deck and expansion joints Remove existing concrete and replace with new reinforced steel and grout Full and partial depth repair of girders Supply and install reinforced concrete overlay
NASS Bridge Demolition
NASS Bridge Demolition Client: Ministry of Transportation and Infrastructure Location: Meziadin Junction, BC Value: $19,100,000 Completed: October 2019 Project Synopsis: Removing a single lane timber structure Foundation Excavation and Backfill Construction of a 2-lane, 145 meter long, 3 span, steel girder bridge with cast-in-place concrete abutments, piers and deck. Construction of 1.9 Kilometers of 2...